Oil and Gas News | Oil and Gas Jobs | Oil and Gas Engineering
The Oil & Gas Hub
  • Main
  • News
  • Photo
  • Video
  • Oilfield Jobs
  • Learning Section
  • Oil & Gas Calculator

Pressure required to brake circulation

  • Drill collar weight calculation to prevent drill pipe buckling
  • Effective mud density
  • Equivalent Circulating Density (ECD) using yield point for MW less than 13 ppg
  • Equivalent Circulating Density (ECD) using yield point for MW more than 13 ppg
  • Lag time calculation
  • Light weight spot fill to balance formation pressure
  • Loss of hydrostatic pressure due to filling water into annulus in case of lost return
  • Margin of over pull
  • Maximum ROP before fracturing formation
  • Pipe elongation due to temperature
  • Pressure required to brake circulation
  • Pump out
  • Pump pressure and pump stroke relationship
  • Stuck pipe calculation
  • Ton mile calculation
  • Volume of cutting generated while drilling
Pressure required overcoming the mud's gel strength inside the drill string
10 min gel strength of mud
ID of drill pipe
Length of drill string
Pressure required to brake circulation inside drill string
psi
Pressure required overcoming the mud's gel strength in the annulus
10 min gel strength of mud
OD of drill pipe
Hole Diameter
Length of drill string
Pressure required to brake circulation inside drill string
psi
Market quotes are powered by TradingView.com
© Oil and Gas News | Oil and Gas Jobs | Oil and Gas Engineering, 2025
ADVERTISE  | Contact Us  | Privacy Policy  
Made in studio Zuber