Oil and Gas News | Oil and Gas Jobs | Oil and Gas Engineering
The Oil & Gas Hub
  • Main
  • News
  • Photo
  • Video
  • Oilfield Jobs
  • Learning Section
  • Oil & Gas Calculator

Depth of washout

  • Accumulator capacity
  • Amount of cuttings drilled per foot of hole drilled
  • Annular capacity between casing or hole and drill pipe, tubing, or casing
  • Annular velocity
  • Buoyancy factor
  • Buoyancy factor with different fluid weight inside and outside
  • Temperature converter
  • Converting pressure into mud weight
  • Coring cost per footage recovered
  • Depth of washout
  • Displacement of plain pipe such as casing, tubing, etc.
  • Cost per foot calculation
  • Equivalent circulating density (ECD)
  • Pressure required for Formation Integrity Test (FIT)
  • Formation temperature
  • How many feet of drill pipe pulled to lose certain amount of hydrostatic pressure
  • Hydrostatic pressure
  • Hydrostatic Pressure (HP) decrease when POOH
  • Leak Off Test (LOT) pressure converted to Equivalent Mud Weight
  • Pressure and force
  • Pressure gradient calculation
  • Slug calculation
  • Specific Gravity
  • Total bit revolution in mud motor
Method 1: The concept of this method is to pump plugging material to plug the wash out. We will know how many stroks pump till pressure increase then we can calculate back where the washout is.
Strokes pumped till pressure increase
Internal capacity of drill pipe
Pump output
Depth of washout
ft
Method 2: The concept of this method is to pump material that can be easily observed from drill pipe pass through wash out into annular and over the surface. We can calculate the depth of washout bases on the combination volume of internal drill pipe volu
Strokes pumped till material seen
Internal capacity of drill pipe
Annular capacity
Pump output
Volume from bell nipple to shale shakers
Depth of washout
ft
Market quotes are powered by TradingView.com
© Oil and Gas News | Oil and Gas Jobs | Oil and Gas Engineering, 2025
ADVERTISE  | Contact Us  | Privacy Policy  
Made in studio Zuber