Oil and Gas News | Oil and Gas Jobs | Oil and Gas Engineering
The Oil & Gas Hub
Special Designed Oilfield Tally Book – Try Now
  • Main
  • News
  • Photo
  • Video
  • Oilfield Jobs
  • Learning Section
  • Oil & Gas Calculator

Multiple zone completion

2019.10.15
4 923

 Multiple zone completion is one type of completion which allows operators to selectively produce or comingle reservoir fluid from different zones into one well. It is also possible to workover the upper part of completion string without removing the next interval completion. Additionally, through tubing perforation is can performed at the bottom zone. A multiple zone completion can be divided into two parts, which are single string completion and multiple string completion.

Related Posts

HitchTrack – The Modern Crew & Shift Scheduler for Oilfield Operations
2025.10.24
147
HitchTrack – The Modern Crew & Shift Scheduler for Oilfield Operations
Managing rotating crews, travel schedules, and field operations can be one of the toughest challenge…
Oil & Gas Well Cementing Engineer Calculator
2025.10.11
320
Oil & Gas Well Cementing Engineer Calculator
Comprehensive cementing design and analysis tool for oil & gas wells
IPR/Nodal Analysis calculator with interactive pressure-flow charts for production optimization
2025.10.05
340
IPR/Nodal Analysis calculator with interactive pressure-flow charts for production optimization
ECD (Equivalent Circulating Density) calculator
2025.10.04
320
ECD (Equivalent Circulating Density) calculator
Market quotes are powered by TradingView.com
© Oil and Gas News | Oil and Gas Jobs | Oil and Gas Engineering, 2025
ADVERTISE  | Contact Us  | Privacy Policy  
Made in studio Zuber